Home extensions in Cheltenham

No.91 Developments are trusted building contractors in Cheltenham, specialising in outdoor structures, extensions, and renovations. An extension adds room to the house you already have, and before anything is built it has to answer three questions: does it need planning permission, how will it meet the Building Regulations, and what do the neighbours need to know.

We don't just follow plans blindly: we want to understand how you'll actually use your space, what matters most to you, and how we can make it work brilliantly for years to come. On large bespoke projects we work alongside 3D designers, so you can see a visualisation of the design first.

Planning permission for an extension

Many house extensions in England can be built without a planning application, under what are called permitted development rights. The rules are national, and the Planning Portal sets them out. In outline, an extension to a house needs no application only if, among other conditions, all of these are true:

  • It stays behind the front. Nothing is built forward of the principal elevation, or of a side elevation that faces a road.
  • A single-storey rear extension reaches no more than 4 metres beyond the original back wall of a detached house, or 3 metres for any other house, and is no more than 4 metres high.
  • An extension of more than one storey reaches no more than 3 metres beyond the original back wall and stays at least 7 metres from the boundary opposite that wall.
  • A side extension is single storey, no more than 4 metres high, and no wider than half the width of the original house.
  • Heights. It is no higher than the highest part of the existing roof, its eaves are no higher than the existing eaves, and within 2 metres of a boundary its eaves are no more than 3 metres high.
  • Half the land. With every other extension and outbuilding, it covers no more than half the land around the original house.
  • Materials look similar to those on the outside of the existing house, and there is no veranda, balcony or raised platform.

The original house means the house as it stood on 1 July 1948, or as it was first built if it is newer, so an earlier owner's extension counts against the limits. The rules are for houses only: flats and maisonettes have none of these rights. Some houses have had the rights removed, by an Article 4 direction or a condition on an earlier planning permission, so check the council's find out if you need planning permission page for your street.

Larger single-storey rear extensions

A single-storey rear extension can reach up to 8 metres on a detached house, or 6 metres on any other house, through prior approval. You tell the council about the extension before you build, the council gives the adjoining neighbours notice and the chance to object, and the work can start once the council approves it, tells you approval is not required, or 42 days pass without a decision (GOV.UK). Prior approval for a larger extension is not available on protected land, which in Cheltenham means a conservation area or the National Landscape.

What changes in Cheltenham

Cheltenham has seven conservation areas, including the large Central Conservation Area, and the hills on its edge are the Cotswolds National Landscape (an Area of Outstanding Natural Beauty). On that land the rules are tighter: any side extension needs planning permission, so does a rear extension of more than one storey, and cladding the outside of the house is not permitted development. Cheltenham Borough Council's conservation areas page has the maps, and our planning guide has an address check that reads the council's conservation area records, the National Landscape boundary and the list of listed buildings for a postcode.

A listed house is different again. Altering or extending a listed building in a way that affects its character needs listed building consent, and carrying out that work without consent is a criminal offence (Planning Portal).

If an extension is inside the limits, a lawful development certificate from the council confirms that it is lawful without a planning application (GOV.UK). It does not cover Building Regulations or listed building consent. The council has the final word on any site.

Building Regulations

Planning and Building Regulations are separate questions, and an extension that needs no planning application usually still needs Building Regulations approval. Most extensions do (Planning Portal). The regulations cover the foundations, the walls, the roof, structural openings, ventilation, energy efficiency, drainage, doors and windows, and the electrics.

Approval comes from the council's building control department or a registered building control approver. Some parts of the work, such as the electrics or the windows, can be signed off by an installer registered with a competent person scheme for that kind of work, without a separate application. Without approval you will not have the certificates of compliance you may need when you sell the house (GOV.UK).

Party walls and neighbours

If the work is on or near the boundary you share with a neighbour, such as building on the boundary line or digging near their house to below the level of its foundations, you must tell them before it starts, under the Party Wall etc. Act 1996 (GOV.UK). This is separate from planning and from Building Regulations, and it applies whether or not the extension needs a planning application.

What clients say

"Harvey and his team completed an excellent Pergola Project at Ellenborough Park. They were professional and on time and on budget. I have used them for several projects and highly recommend them."
Marwan Hemchaoui, Ellenborough Park

More of our work, and more of what clients have said, is on our projects page.

Questions about extensions

Do I need planning permission for an extension in Cheltenham?

Often not, if the extension stays inside the national limits above. In a conservation area or the Cotswolds National Landscape, a side extension or a rear extension of more than one storey needs permission, and an extension to a listed house needs listed building consent.

How far can I extend without planning permission?

For a single-storey rear extension, 4 metres beyond the original back wall of a detached house and 3 metres for any other house. With prior approval those become 8 metres and 6 metres, outside a conservation area or National Landscape. An extension of more than one storey can reach 3 metres beyond the original back wall if it stays 7 metres from the boundary behind, but not in a conservation area or the National Landscape.

Does an extension need Building Regulations approval?

Most extensions do, even when they need no planning permission. Approval comes from the council's building control or a registered building control approver, and it gives you the certificates you may need when you sell.

Do I need to tell my neighbours?

If the work is on or near a shared boundary, yes, under the Party Wall etc. Act 1996. A larger rear extension under prior approval also brings a notice from the council to the adjoining neighbours.

How do I get a quote?

Send a message with the form below or through our contact page, or call 07305 734 697, Monday to Friday, 8am to 5pm. Tell us your address, what you would like to add to the house, and whether you already have drawings or permission, and the team will be in touch.

Contact

Start your project

Share your vision. Let’s build together.

Your details are used only to reply to you. Privacy notice.

Thank you—message received.
Submission failed. Please try again.